Project: wcooper   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:William Cooper   -  
Project:   Vans - RV-10   -   VIEW REPORTS
Total Hours:29.5
Total Flight Time:
Total Expense:$175687.69
Start/Last Date:Jan 29, 2019 - No Finish Date
Engine:Lycoming YIO-540-D4A5 RT(Y)
Propeller:Hartzell C2YR-1BFP/F8068D
Panel:Garmin
 
Friendly URL: https://eaabuilderslog.org?s=wcooper

Home or Last Project Picture

Apr 07, 2021     Sec. 33 Baggage Area       Category: Fuselage
Started on Sec. 33. The Baggage Area floors are already dimpled and drilled with the Quick Build Fuse. Earlier, I had cut an access panel in each of the floor panels. I'll also make an access panel under the rear seat floors. Today I cut the Lower Rear Seat Hinges, including removing two center eyes on each hinge so as to make the hinge pins removable. This same method will be used for the baggage door hinge. Then clecoed the floors into place. Also match and final drilled the baggage door frame seal parts. I plan to run wires prior to the final riveting.


 